Protection System Replacement at Shuweihat S1 Power Plant

Replacement of protection systems for 5 generator-transformer units (262 MVA), 400 kV, 220 kV, and 16.5 kV circuit breaker synchronization, and protection for 400 kV, 220 kV, and 11 kV cables.

GodinaYear 2025.-2026. KlijentClient Shuweihat CMS International Power Company DržavaCountry United Arab Emirates
Zamjena zaštite u elektrani Shuweihat S1

Turnkey Expansion of 20/110 kV Substation Voštane

Turnkey expansion of the 20/110 kV Voštane substation – electrical part, to enable the connection of the Tijarica and Tarabnik solar power plants with a total connection capacity of up to 63 MVA.

GodinaYear 2024.-2025. KlijentClient Vrtača d.o.o., Encro - Voštane d.o.o. DržavaCountry Republic of Croatia
Proširenje transformatorske stanice TS 20/110 kV Voštane po sistemu ključ u ruke

Main Design for 110/20(10) kV Substation Kaštel Stari

Preparation of the Main Design for the 110/20(10) kV Substation Kaštel Stari for investors HOPS d.d. and HEP – ODS d.o.o.

GodinaYear 2024.-2025. KlijentClient HOPS d.d., HEP – ODS d.o.o. DržavaCountry Republic of Croatia
Izrada glavnog projekta transformatorske stanice TS 110/20(10) kV Kaštel Stari

Reconstruction of protection, control, and auxiliary power supply systems at the 132/33 kV Kipawa substation

Delivery and installation of control, protection, and remote control cabinets, new DC and AC power supply systems, and a station service transformer, including complete project design, supervision of works, and final testing before commissioning.

GodinaYear 2023.-2026. KlijentClient Tanzania Electric Supply Company Limited (TANESCO) DržavaCountry United Republic of Tanzania
Rekonstrukcija sustava zaštite, upravljanja i pomoćnih napajanja TS 132/33 kV Kipawa

Modernization and digitalization of the control system for the Mtwara gas power plant.

The project included the delivery of an 11 kV switchgear and the development of the Synapse SCADA system, integrated with regulation for nine gas gensets, ensuring the stability of the Mtwara city island mode through execution without long-term plant outages.

GodinaYear 2023.-2024. KlijentClient Tanzania Electric Supply Company Limited (TANESCO) DržavaCountry United Republic of Tanzania
Modernizacija i digitalizacija sustava vođenja plinske elektrane Mtwara

Implementation of HPP Kihansi and HPP Kidatu into the Automatic Generation Control (AGC) system.

Implementation of a water resource monitoring system at five hydroelectric power plants, including the delivery of sensor and PLC equipment, application development, and data integration into the National Grid Control Center (GCC) with AGC modification, ensuring optimized management without operational downtime.

GodinaYear 2023.-2025. KlijentClient Tanzania Electric Supply Company Limited (TANESCO) DržavaCountry United Republic of Tanzania
Uvođenje HE Kihansi i HE Kidatu u sustav automatske regulacije snage (AGC)

Construction of 33/110 kV Substation Dugobabe and 110 kV Line Bay at 400/220/110 kV Substation Konjsko

Turnkey construction of the 33/110 kV Substation Dugobabe and a connecting 110 kV bay at the 400/220/110 kV Substation Konjsko, enabling the connection of multiple solar power plants with a total capacity of up to 100 MVA.

GodinaYear 2023.-2026. KlijentClient Dugobabe d.o.o., Torine d.o.o., Vidukin Gaj d.o.o. DržavaCountry Republic of Croatia
Izgradnja trafostanice TS 33/110 kV Dugobabe te priključnog 110 kV vodnog polja u TS 400/220/110 kV Konjsko

Revitalization of HPP Kihansi.

Comprehensive modernization of protection, control, and auxiliary power systems in the HPP Kihansi switchgear facilities.

GodinaYear 2023.-2025. KlijentClient Tanzania Electric Supply Company Limited (TANESCO) DržavaCountry United Republic of Tanzania
Revitalizacija HE Kihansi

Construction of 35 kV Switchgear at HPP Dubrava

Construction of the 35 kV switchgear at HPP Dubrava to enable the connection of the Donja Dubrava and Sveta Marija solar power plants, and construction of 35 kV cable lines for the interpolation of HPP Dubrava – 35 kV Switchgear HPP Dubrava - Kotoriba transmission line, with connection to the 110/35 kV transformer at HPP Dubrava.

GodinaYear 2022.-2023. KlijentClient HEP – ODS d.o.o., Elektra Čakovec DržavaCountry Republic of Croatia
Izgradnja 35 kV rasklopnog postrojenja HE Dubrava

Design of 110 kV and 220 kV GIS Facilities at HPP Dubrovnik

Preparation of the preliminary design, main design, obtaining the building permit, and preparation of the detailed design for the 110 kV and 220 kV GIS switchgear at HPP Dubrovnik with connecting 110 kV and 220 kV cable lines.

GodinaYear 2022.-2024. KlijentClient HOPS d.d. DržavaCountry Republic of Croatia
Projektiranje 110 kV i 220 kV GIS postrojenja HE Dubrovnik

Implementation of SCADA System for Lilongwe Water Board, Malawi

A comprehensive solution for the digital monitoring and control of the capital city's water supply system using our proprietary Synapse SCADA system.

GodinaYear 2021. – 2023. KlijentClient Lilongwe Water Board DržavaCountry Malawi
Implementacija SCADA sustava za vodoopskrbni centar Lilongwe, Malawi

Delivery of the control and protection system for the Nyumba Ya Mungu hydroelectric power plant

The modernization of the control and protection system for HPP Nyumba Ya Mungu was successfully completed through the delivery of advanced equipment and software solutions, with gradual commissioning without long-term interruptions in energy production.

GodinaYear 2021.-2022. KlijentClient Tanzania Electric Supply Company Limited (TANESCO) DržavaCountry United Republic of Tanzania
Isporuka sustava upravljanja i zaštite hidroelektrane Nyumba Ya Mungu

Turnkey construction of the 33/110 kV Visoka – Kukuzovac substation.

Turnkey construction of the 33/110 kV Visoka - Kukuzovac substation – electrical part, to enable the connection of the ST3-1/2 Visoka Zelovo wind farm with a total connection capacity of up to 53 MW.

GodinaYear 2021.-2025. KlijentClient Zelovo d.o.o. DržavaCountry Republic of Croatia
Izgradnja TS 33/110 kV Visoka – Kukuzovac po sistemu ključ u ruke

Turnkey Expansion of 220/33 kV Substation Buzwagi

The expansion project of the Buzwagi substation in Tanzania was implemented on a turnkey basis, including the construction of a new 220 kV bay and the installation of 33 kV GIS switchgear with a 30 MVA power transformer.

GodinaYear 2020.-2022. KlijentClient Tanzania Electric Supply Company Limited (TANESCO) DržavaCountry United Republic of Tanzania
Proširenje transformatorske stanice 220/33 kV Buzwagi po sistemu „ključ u ruke“

Turnkey Construction of 132/33 kV Substation Dege Beach

A turnkey project for the construction of the new 132/33 kV Substation Dege Beach in Tanzania, including complete engineering, delivery of primary and secondary equipment, and commissioning.

GodinaYear 2018.-2021. KlijentClient Tanzania Electric Supply Company Limited (TANESCO) DržavaCountry United Republic of Tanzania
Izgradnja TS 132/33 kV Dege Beach po sistemu „ključ u ruke“