Preparation of the preliminary design, main design, obtaining the building permit, and preparation of the detailed design (execution project) for the 110 kV and 220 kV switchgear at HPP Dubrovnik, including connecting 110 kV and 220 kV cable lines for the investor HOPS d.d.
Designed Systems
- Outdoor 110 kV and 220 kV gas-insulated switchgear (GIS) with associated connecting cable lines.
- 400/230 V AC distribution and uninterruptible power supply systems (220 V DC, -48 V DC, and 230 V AC).
- Control, signaling, synchronization, protection, and measurement systems with integration into the remote control system (RCS).
- Electrical installations, earthing, lightning protection, and telecommunication systems.
- Fire alarm system and internal technological video surveillance (CCTV).