The realization of the new 132/33 kV Dege Beach substation project for the client Tanzania Electric Supply Company Limited in Tanzania on a turnkey basis.
Projektiranje, isporuka, montaža, nadzor nad montažom i puštanje u pogon sljedeće opreme
- Outdoor air-insulated switchgear (AIS) 132 kV
- 132/33 kV power transformer with a rated capacity of 60 MVA
- Vanjsko zrakom izolirano (AIS) postrojenje 33 kV
- 400/230 V, 50 Hz AC transformation and distribution
- 110 V DC and -48 V DC uninterruptible power supply systems
- Control, signaling, protection, and measurement
- Electrical installations and lightning protection
- Earthing system
- Telecommunication systems



