The expansion project of the Buzwagi substation in Tanzania was implemented on a turnkey basis, including the construction of a new 220 kV bay and the installation of 33 kV GIS switchgear with a 30 MVA power transformer.

Design, delivery, installation, installation supervision, and commissioning of the following equipment:

  • Formation of the 220 kV busbar system 
  • Construction of a new 220 kV transformer bay
  • 220/33 kV power transformer with a rated capacity of 30 MVA
  • 33 kV gas-insulated switchgear (GIS)
  • 400/230 V, 50 Hz AC transformation and distribution
  • 110 V DC and -48 V DC uninterruptible power supply systems
  • Control, signaling, protection, and measurement
  • Electrical installations and lightning protection
  • Earthing system