{"id":652,"date":"2026-05-07T10:23:48","date_gmt":"2026-05-07T09:23:48","guid":{"rendered":"https:\/\/telenerg.hr\/wptest\/?post_type=projekti&#038;p=652"},"modified":"2026-05-12T14:46:47","modified_gmt":"2026-05-12T13:46:47","slug":"modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara","status":"publish","type":"projekti","link":"https:\/\/www.telenerg.hr\/en\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/","title":{"rendered":"Modernization and digitalization of the control system for the Mtwara gas power plant."},"content":{"rendered":"<p>The project included the delivery of an 11 kV switchgear and the development of the Synapse SCADA system, integrated with regulation for nine gas gensets, ensuring the stability of the Mtwara city island mode through execution without long-term plant outages.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Equipement Delivered<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>11 kV switchgear<\/li>\n\n\n\n<li>24 V DC generation and distribution system<\/li>\n\n\n\n<li>Control system equipment<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1920\" height=\"1440\" src=\"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/86598.jpg\" alt=\"\" class=\"wp-image-543\" srcset=\"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/86598.jpg 1920w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/86598-300x225.jpg 300w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/86598-1024x768.jpg 1024w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/86598-768x576.jpg 768w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/86598-1536x1152.jpg 1536w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/86598-16x12.jpg 16w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/86598-800x600.jpg 800w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/div>\n\n\n<h3 class=\"wp-block-heading\"><strong>Scope of Work<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Preparation of the detailed electrical design with the requirement to integrate synchronization, frequency, and voltage regulation systems for nine gas gensets (2 MVA each) into the new switchgear units.<\/li>\n\n\n\n<li>Development of the Synapse SCADA application for remote monitoring and control of the power plant.<\/li>\n\n\n\n<li>Installation supervision. The works were carried out without long-term total plant shutdowns, using only brief interruptions during periods of minimum load due to the plant\u2019s critical role in the Mtwara city island power system.<\/li>\n\n\n\n<li>Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) of all subsystems.<\/li>\n\n\n\n<li>Phased commissioning until full availability was achieved.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"571\" data-id=\"505\" src=\"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559-1024x571.jpg\" alt=\"\" class=\"wp-image-505\" srcset=\"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559-1024x571.jpg 1024w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559-300x167.jpg 300w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559-768x428.jpg 768w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559-1536x856.jpg 1536w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559-18x10.jpg 18w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559.jpg 1727w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"570\" data-id=\"503\" src=\"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7560-1024x570.jpg\" alt=\"\" class=\"wp-image-503\" srcset=\"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7560-1024x570.jpg 1024w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7560-300x167.jpg 300w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7560-768x428.jpg 768w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7560-1536x855.jpg 1536w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7560-18x10.jpg 18w, https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7560.jpg 1726w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p><\/p>","protected":false},"featured_media":505,"template":"","projekt_kategorija":[],"projekt_lokacija":[],"class_list":["post-652","projekti","type-projekti","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Modernizacija i digitalizacija sustava vo\u0111enja plinske elektrane Mtwara - Telenerg Engineering<\/title>\n<meta name=\"description\" content=\"Projekt je obuhvatio isporuku 11 kV sklopnog postrojenja i razvoj Synapse SCADA sustava uz integraciju regulacije za devet plinskih agregata, osiguravaju\u0107i stabilnost oto\u010dnog pogona grada Mtwara kroz izvedbu bez dugotrajnih zastoja elektrane.\" \/>\n<meta name=\"robots\" content=\"noindex, follow\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modernizacija i digitalizacija sustava vo\u0111enja plinske elektrane Mtwara - Telenerg Engineering\" \/>\n<meta property=\"og:description\" content=\"Projekt je obuhvatio isporuku 11 kV sklopnog postrojenja i razvoj Synapse SCADA sustava uz integraciju regulacije za devet plinskih agregata, osiguravaju\u0107i stabilnost oto\u010dnog pogona grada Mtwara kroz izvedbu bez dugotrajnih zastoja elektrane.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.telenerg.hr\/en\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/\" \/>\n<meta property=\"og:site_name\" content=\"Telenerg Engineering\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T13:46:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1727\" \/>\n\t<meta property=\"og:image:height\" content=\"963\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/projekti\\\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\\\/\",\"url\":\"https:\\\/\\\/www.telenerg.hr\\\/projekti\\\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\\\/\",\"name\":\"Modernizacija i digitalizacija sustava vo\u0111enja plinske elektrane Mtwara - Telenerg Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/projekti\\\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/projekti\\\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.telenerg.hr\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/7559.jpg\",\"datePublished\":\"2026-05-07T09:23:48+00:00\",\"dateModified\":\"2026-05-12T13:46:47+00:00\",\"description\":\"Projekt je obuhvatio isporuku 11 kV sklopnog postrojenja i razvoj Synapse SCADA sustava uz integraciju regulacije za devet plinskih agregata, osiguravaju\u0107i stabilnost oto\u010dnog pogona grada Mtwara kroz izvedbu bez dugotrajnih zastoja elektrane.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/projekti\\\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.telenerg.hr\\\/projekti\\\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/projekti\\\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.telenerg.hr\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/7559.jpg\",\"contentUrl\":\"https:\\\/\\\/www.telenerg.hr\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/7559.jpg\",\"width\":1727,\"height\":963},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/projekti\\\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.telenerg.hr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projekti\",\"item\":\"https:\\\/\\\/www.telenerg.hr\\\/en\\\/projekti\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Modernizacija i digitalizacija sustava vo\u0111enja plinske elektrane Mtwara\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/#website\",\"url\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/\",\"name\":\"Telenerg Engineering\",\"description\":\"Expertise shaping the future\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/#organization\",\"name\":\"Telenerg Engineering\",\"url\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.telenerg.hr\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/53543.jpg\",\"contentUrl\":\"https:\\\/\\\/www.telenerg.hr\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/53543.jpg\",\"width\":1920,\"height\":1013,\"caption\":\"Telenerg Engineering\"},\"image\":{\"@id\":\"https:\\\/\\\/www.telenerg.hr\\\/hr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/telenerg-engineering\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Modernizacija i digitalizacija sustava vo\u0111enja plinske elektrane Mtwara - Telenerg Engineering","description":"The project included the delivery of an 11 kV switchgear and the development of the Synapse SCADA system, integrated with regulation for nine gas gensets, ensuring the stability of the Mtwara city island mode through execution without long-term plant outages.","robots":{"index":"noindex","follow":"follow"},"og_locale":"en_US","og_type":"article","og_title":"Modernizacija i digitalizacija sustava vo\u0111enja plinske elektrane Mtwara - Telenerg Engineering","og_description":"Projekt je obuhvatio isporuku 11 kV sklopnog postrojenja i razvoj Synapse SCADA sustava uz integraciju regulacije za devet plinskih agregata, osiguravaju\u0107i stabilnost oto\u010dnog pogona grada Mtwara kroz izvedbu bez dugotrajnih zastoja elektrane.","og_url":"https:\/\/www.telenerg.hr\/en\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/","og_site_name":"Telenerg Engineering","article_modified_time":"2026-05-12T13:46:47+00:00","og_image":[{"width":1727,"height":963,"url":"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.telenerg.hr\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/","url":"https:\/\/www.telenerg.hr\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/","name":"Modernizacija i digitalizacija sustava vo\u0111enja plinske elektrane Mtwara - Telenerg Engineering","isPartOf":{"@id":"https:\/\/www.telenerg.hr\/hr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.telenerg.hr\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/#primaryimage"},"image":{"@id":"https:\/\/www.telenerg.hr\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/#primaryimage"},"thumbnailUrl":"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559.jpg","datePublished":"2026-05-07T09:23:48+00:00","dateModified":"2026-05-12T13:46:47+00:00","description":"The project included the delivery of an 11 kV switchgear and the development of the Synapse SCADA system, integrated with regulation for nine gas gensets, ensuring the stability of the Mtwara city island mode through execution without long-term plant outages.","breadcrumb":{"@id":"https:\/\/www.telenerg.hr\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.telenerg.hr\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.telenerg.hr\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/#primaryimage","url":"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559.jpg","contentUrl":"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/7559.jpg","width":1727,"height":963},{"@type":"BreadcrumbList","@id":"https:\/\/www.telenerg.hr\/projekti\/modernizacija-i-digitalizacija-sustava-upravljanja-plinske-elektrane-mtwara\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.telenerg.hr\/"},{"@type":"ListItem","position":2,"name":"Projekti","item":"https:\/\/www.telenerg.hr\/en\/projekti\/"},{"@type":"ListItem","position":3,"name":"Modernizacija i digitalizacija sustava vo\u0111enja plinske elektrane Mtwara"}]},{"@type":"WebSite","@id":"https:\/\/www.telenerg.hr\/hr\/#website","url":"https:\/\/www.telenerg.hr\/hr\/","name":"Telenerg Engineering","description":"Expertise shaping the future","publisher":{"@id":"https:\/\/www.telenerg.hr\/hr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.telenerg.hr\/hr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.telenerg.hr\/hr\/#organization","name":"Telenerg Engineering","url":"https:\/\/www.telenerg.hr\/hr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.telenerg.hr\/hr\/#\/schema\/logo\/image\/","url":"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/53543.jpg","contentUrl":"https:\/\/www.telenerg.hr\/wp-content\/uploads\/2026\/05\/53543.jpg","width":1920,"height":1013,"caption":"Telenerg Engineering"},"image":{"@id":"https:\/\/www.telenerg.hr\/hr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/telenerg-engineering"]}]}},"_links":{"self":[{"href":"https:\/\/www.telenerg.hr\/en\/wp-json\/wp\/v2\/projekti\/652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.telenerg.hr\/en\/wp-json\/wp\/v2\/projekti"}],"about":[{"href":"https:\/\/www.telenerg.hr\/en\/wp-json\/wp\/v2\/types\/projekti"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.telenerg.hr\/en\/wp-json\/wp\/v2\/media\/505"}],"wp:attachment":[{"href":"https:\/\/www.telenerg.hr\/en\/wp-json\/wp\/v2\/media?parent=652"}],"wp:term":[{"taxonomy":"projekt_kategorija","embeddable":true,"href":"https:\/\/www.telenerg.hr\/en\/wp-json\/wp\/v2\/projekt_kategorija?post=652"},{"taxonomy":"projekt_lokacija","embeddable":true,"href":"https:\/\/www.telenerg.hr\/en\/wp-json\/wp\/v2\/projekt_lokacija?post=652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}