The realization of the new 132/33 kV Dege Beach substation project for the client Tanzania Electric Supply Company Limited in Tanzania on a turnkey basis.
Designed and Delivered Equipment
- Outdoor 132 kV air-insulated switchgear (AIS) and outdoor 33 kV air-insulated switchgear (AIS).
- 132/33 kV power transformer with a rated capacity of 60 MVA.
- 400/230 V AC transformation and distribution, along with 110 V DC and -48 V DC uninterruptible power supply systems.
- Comprehensive control, signaling, protection, and measurement systems.
- Electrical installations, lightning protection system, earthing, and telecommunication systems.



