Modernization of the protection and synchronization systems was realized for five generator-transformer units with a total capacity exceeding 1300 MVA, including HV and MV cable bays. Through the preparation of the detailed design and rigorous field testing, maximum reliability and precise circuit breaker control were ensured for 220 kV and 400 kV operations.

Equipement Delivered

  • Protection systems for 5 generator-transformer units (262 MVA)
  • Synchronization systems for 4 generator circuit breakers (16.5 kV)
  • Synchronization system for 3 block circuit breakers (400 kV)
  • Synchronization system for 2 block circuit breakers (220 kV)
  • Protection systems for 3 HV cables (400 kV)
  • Protection systems for 2 HV cables (220 kV)
  • Protection systems for 15 MV cables (11 kV)
  • Communication and time synchronization system for protection relays
  • Spare parts

Scope of Work

  • Preparation of the detailed design (execution project)
  • Equipment installation
  • Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT)
  • Commissioning